Stochastic Project Networks: Temporal Analysis, Scheduling and Cost Minimization
Book information
Description
Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called "classical" project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does not conform to certain specifications, it must be repaired or replaced by a new item. This means that we have to return to a preceding stage of the production process. In other words, there is feedback. Note that the result of the inspection is that a certain percentage of the parts tested do not conform. That is, there is a positive probability (strictly less than 1) that any part is defective.
Similar books
Excel Data Analysis: Modeling and Simulation
2010 · PDF
Modellbildung bei Mehrfachzielen: Prozeßorganisation, Verfahren mit Fuzzy-Sets und Anwendungsbeispiele aus der Personaleinsatzplanung
1992 · PDF
Performance Measurement in Corporate Governance: DEA Modelling and Implications for Organisational Behaviour and Supply Chain Management
2009 · PDF
Decision Making Structures: Dealing with Uncertainty within Organizations
1996 · PDF
Die Flexibilität von Betriebsvereinbarungen zur Arbeitszeit
1995 · PDF
Modelle und Verfahren zur innerbetrieblichen Standortplanung
1994 · PDF
Wissenbasierte Unternehmensstrategieentwicklung: Perspektiven für die Architektur integrierter, computergestützte Führungssysteme
1991 · PDF
Risiko, Anreiz und Kontrolle: Principal-Agent-Theorie Einführung und Verbindung mit dem Delegationswert-Konzept
1990 · PDF