Applying Decommissioning Experience to the Design and Operation of New Nuclear Power Plants
Book information
Description
Experience from decommissioning projects suggests that the decommissioning of nuclear power plants could be made easier if it received greater consideration at the design stage and during the operation of the plants. Better forward planning for decommissioning results in lower worker doses and reduced costs. When appropriate design measures are not taken at an early stage, their introduction later in the project becomes increasingly difficult. Hence, their early consideration may lead to smoother and more effective decommissioning. It is now common practice to provide a preliminary decommissioning plan as part of the application for a licence to operate a nuclear facility. This means, in turn, that decommissioning issues are being considered during the design process. Although many design provisions aiming at improved operation and maintenance will be beneficial for decommissioning as well, designers also need to consider issues that are specific to decommissioning, such as developing sequential dismantling sequences and providing adequate egress routes. These issues and more are discussed in this report. Read more...
Similar books
Nuclear Micro Reactors
2020 · EPUB
Power Density - A Key to Understanding Energy Sources and Uses
2015 · PDF
Perspectives of India's Nuclear Policy
1978 · PDF
The Political Economy Of Nuclear Energy: Prospects And Retrospect
2019 · PDF
The Technological and Economic Future of Nuclear Power
2019 · PDF
Microbial Influence on the Performance of Subsurface, Salt-Based Radioactive Waste Repositories : An Evaluation Based on Microbial Ecology, Bioenergetics and Projected Repository Conditions
2018 · PDF
Preparing for Decommissioning During Operation and After Final Shutdown
2018 · PDF
State-of-the-art Report on the Progress of Nuclear Fuel Cycle Chemistry
2018 · PDF