Modeling, Simulation, and Control of a Medium-Scale Power System
Book information
Description
""Acknowledgements""; ""Contents""; ""About the Authors""; ""List of Figures""; ""List of Tables""; ""Abstract""; ""1 Introduction""; ""2 Literature Survey""; ""2.1 Structure of an Electrical Power System""; ""2.2 Power System Stability""; ""2.3 Why Power System Instability Situations Occur?""; ""2.4 Disturbances""; ""2.4.1 Effects of the Disturbances on the Power System""; ""2.5 Reliability of a Power System""; ""2.6 Quality of a Power System""; ""2.6.1 Addressing Instability Situations Due to Perturbations in the Power System""; ""2.6.2 Classification of Power System Dynamics"";""5.2 Discussion: Load Shedding Scheme-II with Generation Deficit of 495.14Â MW""""5.2.1 Performance of the National Grid""; ""5.2.2 Performance of Island Rantembe""; ""5.2.3 Performance of Island Matugama""; ""5.2.4 Performance of Island Embilipitiya""; ""5.2.5 Performance of Island Kiribathkumbura""; ""5.3 Performance Comparison on Selected Load Shedding Schemes (LSS)""; ""6 Conclusion""; ""Appendices""; ""Appendix A: Transmission Lines""; ""Appendix B: Composite Loads""; ""Appendix C: Generation Characteristic""; ""Appendix D"";""3.3.1 LS Logic1 Control System Module""""3.3.2 U_Frequency Control System Module""; ""3.3.3 Add_Ld Control System Module""; ""3.4 Verifying the Simulation Model Performance""; ""3.4.1 Steady State Operation""; ""3.4.2 Generator Tripping/Sudden Generation Deficit Situation""; ""4 Designing the Load Shedding Scheme""; ""4.1 Overview of the Power System of Sri Lanka""; ""4.2 Identification of Parameters""; ""4.2.1 Power System Regulations and Practice of Sri Lanka""; ""4.2.2 Identifying Settling Frequency""; ""4.2.3 Deciding the Number of Steps in the Load Shedding Scheme"";""4.2.4 First Step of Load Shedding Scheme""""4.2.5 Identifying When to Implement Load Shedding Based on Rate of Change of Frequency (ROCOF)""; ""4.2.6 Delay Time""; ""4.3 Ahsansâ#x80; #x99; Scheme as a Pilot Model [56]""; ""4.4 Proposed Methodology""; ""4.4.1 Load Shedding Scheme-I (Based on Prevailing Facilities Available with the CEB)""; ""4.4.2 Load Shedding Scheme-II (Based on Disintegration of the Power System)""; ""5 Results and Discussion""; ""5.1 Discussion: Load Shedding Scheme-I with Generation Deficit of 829.6Â MW"";This book highlights the most important aspects of mathematical modeling, computer simulation, and control of medium-scale power systems. It discusses a number of practical examples based on Sri Lanka's power system, one characterized by comparatively high degrees of variability and uncertainty. Recently introduced concepts such as controlled disintegration to maintain grid stability are discussed and studied using simulations of practical scenarios. Power systems are complex, geographically distributed, dynamical systems with numerous interconnections between neighboring systems. Further, they often comprise a generation mix that includes hydro, thermal, combined cycle, and intermittent renewable plants, as well as considerably extended transmission lines. Hence, the detailed analysis of their transient behaviors in the presence of disturbances is both highly theory-intensive and challenging in practice. Effectively regulating and controlling power system behavior to ensure consistent service quality and transient stability requires the use of various schemes and systems. The book's initial chapters detail the fundamentals of power systems; in turn, system modeling and simulation results using Power Systems Computer Aided Design/Electromagnetic Transients including DC (PSCAD/EMTDC) software are presented and compared with available real-world data. Lastly, the book uses computer simulation studies under a variety of practical contingency scenarios to compare several under-frequency load-shedding schemes. Given the breadth and depth of its coverage, it offers a truly unique resource on the management of medium-scale power systems.;""2.7 Process for Generation-Load Balance""""2.7.1 Primary Control (Is by Governors)""; ""2.7.2 Secondary Control (Is by Automatic Generation Controls)""; ""2.7.3 Tertiary Control""; ""2.7.4 Time Control""; ""2.8 Under-Frequency Load Shedding""; ""3 Modelling the Power System""; ""3.1 Power System Components""; ""3.2 Configuring Power System Components/Mathematical Modeling""; ""3.2.1 Transmission Lines""; ""3.2.2 Under-Ground Cables""; ""3.2.3 Transformers""; ""3.2.4 Generators""; ""3.2.5 Exciters""; ""3.2.6 Turbines""; ""3.2.7 Governors""; ""3.3 Control System of the Overall Power System"" ""Acknowledgements"" ""Contents"" ""About the Authors"" ""List of Figures"" ""List of Tables"" ""Abstract"" ""1 Introduction"" ""2 Literature Survey"" ""2.1 Structure of an Electrical Power System"" ""2.2 Power System Stability"" ""2.3 Why Power System Instability Situations Occur?"" ""2.4 Disturbances"" ""2.4.1 Effects of the Disturbances on the Power System"" ""2.5 Reliability of a Power System"" ""2.6 Quality of a Power System"" ""2.6.1 Addressing Instability Situations Due to Perturbations in the Power System"" ""2.6.2 Classification of Power System Dynamics"" ""2.7 Process for Generation-Load Balance""""2.7.1 Primary Control (Is by Governors)"" ""2.7.2 Secondary Control (Is by Automatic Generation Controls)"" ""2.7.3 Tertiary Control"" ""2.7.4 Time Control"" ""2.8 Under-Frequency Load Shedding"" ""3 Modelling the Power System"" ""3.1 Power System Components"" ""3.2 Configuring Power System Components/Mathematical Modeling"" ""3.2.1 Transmission Lines"" ""3.2.2 Under-Ground Cables"" ""3.2.3 Transformers"" ""3.2.4 Generators"" ""3.2.5 Exciters"" ""3.2.6 Turbines"" ""3.2.7 Governors"" ""3.3 Control System of the Overall Power System"" ""3.3.1 LS Logic1 Control System Module""""3.3.2 U_Frequency Control System Module"" ""3.3.3 Add_Ld Control System Module"" ""3.4 Verifying the Simulation Model Performance"" ""3.4.1 Steady State Operation"" ""3.4.2 Generator Tripping/Sudden Generation Deficit Situation"" ""4 Designing the Load Shedding Scheme"" ""4.1 Overview of the Power System of Sri Lanka"" ""4.2 Identification of Parameters"" ""4.2.1 Power System Regulations and Practice of Sri Lanka"" ""4.2.2 Identifying Settling Frequency"" ""4.2.3 Deciding the Number of Steps in the Load Shedding Scheme"" ""4.2.4 First Step of Load Shedding Scheme""""4.2.5 Identifying When to Implement Load Shedding Based on Rate of Change of Frequency (ROCOF)"" ""4.2.6 Delay Time"" ""4.3 Ahsansâ#x80 #x99 Scheme as a Pilot Model [56]"" ""4.4 Proposed Methodology"" ""4.4.1 Load Shedding Scheme-I (Based on Prevailing Facilities Available with the CEB)"" ""4.4.2 Load Shedding Scheme-II (Based on Disintegration of the Power System)"" ""5 Results and Discussion"" ""5.1 Discussion: Load Shedding Scheme-I with Generation Deficit of 829.6Â MW"" ""5.2 Discussion: Load Shedding Scheme-II with Generation Deficit of 495.14Â MW""""5.2.1 Performance of the National Grid"" ""5.2.2 Performance of Island Rantembe"" ""5.2.3 Performance of Island Matugama"" ""5.2.4 Performance of Island Embilipitiya"" ""5.2.5 Performance of Island Kiribathkumbura"" ""5.3 Performance Comparison on Selected Load Shedding Schemes (LSS)"" ""6 Conclusion"" ""Appendices"" ""Appendix A: Transmission Lines"" ""Appendix B: Composite Loads"" ""Appendix C: Generation Characteristic"" ""Appendix D""
Similar books
Modeling, simulation, and control of a medium-scale power system
2018 · PDF
EXCEL 2023 CRASH COURSE: Master Excel 2023 With This Complete Crash Course In 7 Days
2022 · EPUB
The arraignment and tryall with a declaration of the Ranters also, several sentences proceedings at the sessions in the Old-Baily, and Councel of War: their protestations and the hanging of one up by the thumbs; with divers penalties to be inflicted upon others. The dancing and revelling of Dr. Buckeridge and his wife, and other gent. dancing all in white, in Berkshire, and their Christmas carol. A dispute between a Ranter in Bridewel, and one that came to see him; with his creed and pater noster: and the names of the false gods they worship. As also, a list of many of the Ranters, from whence they are derived: and of many hundreds of them in England
2019 · EPUB
The discoverer; vvherein is set forth (to undeceive the nation) the reall plots and stratagems of Lievt. Col. John Lilburn, Mr. William Walwyn, Mr. Thomas Prince, Mr. Richard Overton, and that partie ... Namely, under the pretence and colour of libertie ... a most dangerous and destructive designe is carried on to deprive the nation of their religion, rights, liberties, proprieties, lawes, government, &c. and to bring a totall and universall ruine upon the land. And so much is here clearely proved. The first part
2019 · EPUB
An act to impower Sir John Molesworth: Baronet, and Joseph Moyle, Esquire, Two of the surviving Trustees, in an Indenture, dated the Twenty-Fifth Day of December One thousand Seven hundred and Forty-Three, to raise the several Sums in the said Indenture mentioned, or such of them as are still unsatisfied, and pay the same, as well as the rest of the personal Estate of Hugh Gregor, deceased, to such Person as Jane Gregor, an Infant, shall marry during her Infancy, with the Consent of the surviving Trustees, and of her Guardians
EPUB
Case Histories
2008 · EPUB
Pandora's Seed: The Unforeseen Cost of Civilization
2010 · EPUB
Obama's Wars
2010 · EPUB