Spon's civil engineering and highway works price book 2022
Book information
Description
Cover Half Title Title Page Copyright Page Table of Contents Preface to the Thirty-Sixth Edition Acknowledgements Part 1: General Brexit and the UK construction sector Purpose and content of the book Outline of the tendering and estimating process Research & Development (R&D) tax relief Capital allowances Value added tax The aggregates levy Land remediation The landfill tax Part 2: Oncosts and Profit Risk/opportunity Head office overheads Profit Finance costs – assessment of contract investment Value added tax Tender summary Part 3: Cost and Tender Price Indices Introduction A constructed cost index The road construction cost index Regional variations Part 4: Resources Basis of this section Labour costs Plant costs Part 5: Approximate Estimating Preliminaries and general items Building prices per square metre Approximate estimating rates – General building works 1 Substructure 1.1 Substructure 2 Superstructures 2.1 Frame 2.2 Upper floors 2.3 Roof 2.4 Stairs and ramps 2.5 External walls 2.6 Windows and external doors 2.7 Internal walls and partitions 2.8 Internal doors 3 Internal finishes 3.1 Wall finishes 3.2 Floor finishes 3.3 Ceiling finishes 4 Fittings, furnishings and equipment 4.1 Fittings, furnishings and equipment 5 Services 5.1 Sanitary installations 5.4 Water installations 5.6 Space heating and air conditioning 5.7 Ventilating systems 5.8 Electrical installations 5.9 Fuel installations 5.10 Lift and conveyor installations 5.11 Fire and lightning protection 5.12 Communication and security Installations 5.13 Special installations 5.14 Builder’s work in connection with services 8 External works 8.2 Roads, paths, pavings and surfaces 8.3 Soft landscaping, planting and irrigation systems 8.4 Fencings, railings and walls 8.5 External fixtures 8.6 External drainage 8.7 External services 8.8 Ancillary buildings and structures 9 Main contractor’s preliminaries 9.2 Main contractor’s preliminaries Approximate estimating rates – Ancillary building works Water and treatment facilities Earth retention and stabilization Bridgeworks Tunnelling field costs Highway works Underpasses Access scaffolding Temporary works Part 6: Unit Costs – Civil Engineering Works Introductory notes Guidance notes Class A: General items Class B: Ground investigation Class C: Geotechnical and other specialist processes Class D: Demolition and site clearance Class E: Earthworks Class F: In situ concrete Class G: Concrete ancillaries Class H: Precast concrete Class I: Pipework -pipes Class J: Pipework – fittings and valves Class K: Pipework – manholes and pipework ancillaries Class L: Pipework – supports and protection, ancillaries to laying and excavation Class M: Structural metalwork Class N: Miscellaneous metalwork Class O: Timber Class P: Piles Class Q: Piling ancillaries Class R: Roads and pavings Class S: Rail track Class T: Tunnels Class U: Brickwork, blockwork and masonry Class V: Painting Class W: Waterproofing Class X: Miscellaneous work Class Y: Sewer and water main renovation and ancillary works Part 7: Unit Costs – Highway Works Introductory notes Guidance notes Series 100: Preliminaries Series 200: Site clearance Series 300: Fencing Series 400: Road restraint systems (vehicle and pedestrian) Series 500: Drainage and service ducts Series 600: Earthworks Series 700: Pavements Series 1100: Kerbs, footways & paved areas Series 1200: Traffic signs and road markings Series 1300: Road lighting columns and brackets, CCTV masts and cantilever masts Series 1400: Electrical work for road lighting and traffic signs Series 1500: Motorway communications Series 1600: Piling and embedded retaining walls Series 1700: Structural concrete Series 1800: Steelwork for structures Series 1900: Protection of steelwork against corrosion Series 2000: Waterproofing for structures Series 2100: Bridge bearings Series 2300: Bridge expansion joints and sealing of gaps Series 2400: Brickwork, blockwork and stonework Series 2500: Special structures Series 2700: Accommodation works, works for statutory undertakers Series 3000: Landscape and ecology Series 5000: Maintenance painting of steelwork Part 8: Daywork Introduction Schedules of dayworks carried out incidental to contract work Application of dayworks Part 9: Professional Fees Consulting engineers' conditions of appointment Quantity surveyors' conditions of appointment Part 10: Outputs Disposal of excavated materials Breaking out pavements, brickwork, concrete and masonry by hand and pneumatic breaker Loading loose materials and items by hand Placing ready mixed concrete in the works Fixing bar reinforcement Erecting formwork to beams and walls Erecting formwork to slabs Multipliers for formwork Laying and jointing flexible-jointed clayware pipes Precast concrete manholes in sections Tunnelling, diaphragm walls, major earthworks & fencing Part 11: Useful Addresses for Further Information Part 12: Tables and Memoranda Index
Similar books
Spons' architects' and builders' price book. 2022
2022 · PDF
Evolutia unei revolutii. Bazele psihoterapiei rational-emotive
2015 · EPUB
St Albans Abbey: The Excavation of the Chapter House 1978
2024 · PDF
The Concise Cinegraph: Encyclopaedia of German Cinema
2009 · PDF
Gastrointestinale Tumoren
2018 · PDF
Travel health nursing : scope and standards of practice
2021 · PDF
Spon's mechanical and electrical services price book 2022
2021 · PDF
Student atlas
2015 · PDF