Electrical inspection, testing and certification : a guide to passing the City and Guilds 2391 exams
Book information
Description
Cover Half Title Title Page Copyright Page Table of contents Introduction 1. Statutory and non-statutory regulations 1.1 Legal responsibilities 1.2 The memorandum of guidance on the electricity at work regulations 1989 1.3 BS 7671 wiring regulations 1.4 Inspector’s status: differentiating between the terms in law and legal 1.5 IET guidance note 3 inspection & testing 2. Certification and reports 2.1 Documentation 2.2 Electrical installation certificate (EIC) 2.3 Schedule of inspection 2.4 Minor electrical installation works certificate (minor works certificate) 2.5 Electrical installation condition report (EICR) 2.6 Condition report inspection schedule (for domestic and similar premises with up to 100A supply) 2.7 Schedule of test results 3. Electrical safety 3.1 Regulation 12 – means for cutting off the supply and for isolation 3.2 Regulation 13 – precaution for work on equipment made dead 3.3 Regulation 14 – work on or near live conductors 3.4 Isolation procedure 3.5 Terminology: electrical charge and live 3.6 HSE GS 38: electrical test equipment for use on low voltage electrical systems 4. Installation Testing 4.1 Initial verification 4.2 Sequence of tests 4.3 Test sequence 4.4 Instrument check 4.5 Safe isolation 4.6 Test 1 i): Continuity of protective conductors 4.7 Continuity of protective conductor: testing methods 4.8 Test 1 ii): Continuity of ring final circuit conductors 4.9 Spurious results 4.10 Test 2: Insulation resistance 4.11 Testing preliminaries 4.12 Test results 4.13 Test 3 i): Confirming SELV or PELV circuits by insulation testing 4.14 Testing procedure 4.15 Test 3 ii): Electrical separation 4.16 Test 4: Insulation resistance/impedance of floors and walls 4.17 Test 5: Polarity testing 4.18 Test 6: Protection by automatic disconnection of supply (ADS) 4.19 Test 7: Earth electrode resistance 4.20 Test 8: Earth fault loop impedance verification 4.21 Measurement of earth fault loop impedance (Zs) 4.22 Measurement of external earth fault loop impedance (Ze) 4.23 Test 9: Prospective fault current (Ipf) 4.24 Reasons for measuring PSCC and PEFC 4.25 Breaking capacities 4.26 Test 10: Additional protection 4.27 Test 11: Phase sequence 4.28 Test 12: Functional testing 4.29 Test 13: Verification of voltage drop 4.30 Verification in medical locations 4.31 Temporary overvoltages due to high voltage systems 4.32 Verification of protection against overvoltages of atmospheric origin or due to switching 4.33 Selection and erection of surge protective devices 4.34 Verification of measures against electromagnetic disturbance 5. Initial verification 5.1 The purpose of the initial verification 5.2 Departures from BS 7671 5.3 Foremost inspection 5.4 Inspection of installed equipment 5.5 Inspector’s responsibilities 5.6 Required information 6. Periodic inspection 6.1 Purpose of periodic inspection and testing 6.2 Necessity for Periodic inspection and testing 6.3 Required information 6.4 What action should be taken where diagrams, charts or tables are not available? 6.5 What is a survey? 6.6 Sampling 6.7 Setting the sample size 6.8 Results of sampled inspection and testing 6.9 Frequency of periodic inspections 6.10 Competence 7. Initial verification and periodic inspection questions 8. Further questions 9. Equations and calculations 9.1 Cable resistance 9.2 Voltage drop 9.3 Earth fault loop impedance 9.4 Insulation resistance 9.5 Insulation resistivity 9.6 RCD used fault protection 10. C&G 2391-50, 51 and 52 syllabi Glossary of terms Index
Similar books
MySQL® Notes for Professionals book
2018 · PDF
MrExcel 2022: Boosting Excel
2022 · PDF
MrExcel 2022: Boosting Excel
2022 · PDF
Session C11: Ancient Cultural Landscapes in South Europe – their Ecological Setting and Evolution, Session C22: Gardeners from South America, Session S04: Agro-Pastoralism and Early Metallurgy Sessions, Session WS29: The Idea of Enclosure in Recent Iberian Prehistory, Session C88: Rhytmes et causalites des dynamiques de l'anthropisation en Europe entre 6500 ET 500 BC: Hypotheses socio-culturelles et/ou climatiques: Proceedings of the XV UISPP World Congress (Lisbon 4-9 September 2006) / Actes du XV Congrès Mondial (Lisbonne 4-9 Septembre 2006) Vol.36
2010 · PDF
THE BRITISH ARMY IN INDIA: ITS PRESERVATION BY AN APPROPRIATE CLOTHING, HOUSING, LOCATING, RECREATIVE EMPLOYMENT, AND HOPEFUL ENCOURAGEMENT OF THE TROOPS. with AN APPENDIX ON INDIA : THE CLIMATE OP ITS HILLS ; THE DEVELOPMENT OF ITS RESODRCBS, INDUSTRY, AND ARTS ; THE ADMINISTRATION OF JUSTICE ; THE BLACK ACT ; THE PROGRESS OF CHRISTIANITY ; THE TRAFFIC IN OPIUM ; THE VALUE OF INDIA ; PERMANENT CAUSES OF DISAFFECTION, AND OF THE RECENT REBELLION ; THE TRADITIONARY POLICY; MISGOVERNMENT BY NATIVE RULERS ; ANNEXATIONS OF THEIR TERRITORY, ETC.
1858 · PDF
Idries Shah 27 Books Collection : A Perfumed Scorpion, A Veiled Gazelle, Caravan of Dreams, Darkest England, Destination Mecca, Evenings with Idries Shah, Knowing How to Know, Learning How to Learn, Letters and Lectures of Idries Shah, Neglected aspects of Sufi study, Observations, Oriental Magic, Reflections, Seeker after Truth, Special Illumination, Special Problems in the study of Sufi ideas, Sufi thought and action, Tales of the Dervishes, The Dermis Probe, The Elephant in the Dark, The Englishman Handbook, Idries Shah Antology, The Magic Monastery, The natives are restless, wisdom of the Idiots PDF.
2022 · PDF
The travels of Capts. Lewis and Clarke from St. Louis, by way of the Missouri and Columbia rivers, to the Pacific ocean; performed in the years 1804, 1805 & 1806, by order of the government of the United States. Containing delineations of the manners, customs, religion, &c. of the Indians, comp. from various authentic sources, and original documents, and a summary of the Statistical view of the Indian nations, from the official communication of Meriwether Lewis. Illustrated with a map of the country, inhabited by the western tribes of Indians
1809 · PDF
Professional Linux kernel architecture ''Wrox programmer to programmer''--Cover. - ''What you are reading right now is the result of an evolution over more than seven years: After two years of writing, the first edition was published in German by Carl Hanser Verlag in 2003. It then described kernel 2.6.0. The test was used as a basis for the low-level design documentation for the EAL4+ security evaluation of Red Hat Enterprise Linux 5, requiring to update it to kernel 2.6.18 (if the EAL acronym does not mean anything to you, then Wikipedia is once more your friend). Hewlett-Packard sponsored the translation into English and has, thankfully, granted the rights to publish the result. Updates to kernel 2.6.24 were then performed specifically for this book''--P. ix
2008 · PDF